THE 1-89 NORTHBOUND EXIT 10 OFF RAMP WILL BE CLOSED FROM MONDAY MORNING 7/25 TO FRIDAY 7/30 DAY AND NIGHT.

 

The work is part of the 7 1/2-mile-long rehabilitation project of 1-89 in Sutton. A press release will be sent out later this week and there will be messages posted on the message boards on 1-89.

During the closure, a signed detour will be in place directing motorists north to Exit 11 to reverse direction and return to Exit 10 via 1-89 Southbound. The estimated additional driving time should take around 8 minutes.

 

Sometime later this summer there will be additional closures of the ramps at Exit 10, one ramp at a time.